Service: integrated operations and maintenance

Integrated operations and maintenance for secure facilities

Integrated operations and maintenance puts hard services, soft services, and the compliance record in the hands of one cleared, self-performed team under one agreement per site. As a result, the hand-offs between vendors disappear. So do the escort hours, the missed PMs, and the calls that reach you because nobody owns the gap.

Request a Readiness Scan

Integrated operations and maintenance puts one self-performing team on a site’s HVAC, electrical, plumbing, lighting, and building systems, and on its custodial, industrial housekeeping, grounds, and waste. The same team keeps the completion, access, and corrective-action records, all under one site manager and one operating system. For defense and aerospace plants, IH Services delivers it with a DoD Cleared Workforce, which removes both the escort burden and the hand-offs that a multi-vendor model creates in controlled space.

What integrated operations and maintenance replaces

The industry benchmark is eight to twelve facility vendors per site once you count the off-contract buys. Each one has its own purchase order, insurance file, badge request, and escalation path. Yet none of them owns the space between their scopes. Three costs follow.

Coordination time

Your facility lead becomes the switchboard, scheduling, chasing, and reconciling. Then they explain one vendor’s problem to another. The hours are real, and above all, they are yours.

Escort hours

Every uncleared vendor in a controlled area ties up a cleared employee for the visit. Our planning assumption is a 1.5x to 2x cost multiplier on that labor, and none of it shows on the invoice.

Reactive drift

Call-out vendors earn their money on reactive work, so nobody has a reason to prevent it. The U.S. Department of Energy’s O&M Best Practices Guide puts preventive maintenance 12 to 18 percent cheaper than reactive.

How integrated operations and maintenance works at IH Services

One team. IH employees perform the custodial, housekeeping, grounds, waste, and MEP maintenance, cross-trained where the site allows, under one site manager who answers to your facility lead.

One operating system. R3 Secure FacilityOps drives Reliability, Responsiveness, and Reduction through FORCE, our service-level management framework: Flow, Optimize, Reliable, Control, Execute. In practice, every scheduled task closes with a completion record, every controlled-area visit reconciles with your access log, and every corrective action carries root cause and closure.

One agreement. A single scope, a single escalation path, and a single supplier record for your sourcing team, together with KPIs that we report monthly from the same system that manages the work.

One cleared bench. Cleared IH employees earn a wage differential, not a premium rate. In addition, we clear two or three people beyond what the site needs, so when a cleared employee’s performance slips we change them out from the bench rather than keep them on because a replacement clearance would take months.

One boundary. Our scope stops at the production equipment line. Facility systems, building envelope, housekeeping, and waste are ours, while the tooling is yours. Corrugate removal and recycling is the one task that crosses into production space.

Integrated operations and maintenance: IH Services site manager reviewing work orders

Where integrated maintenance savings come from

Six levers, which we track as planning assumptions and confirm against each site’s own baseline before we commit to any number. The year-one structural target is 10 to 15 percent of in-scope facility cost.

Lever Planning weight What changes on your site
Process waste 22% Hand-offs, duplicate mobilizations, and coordination hours disappear when one team owns the whole scope.
Labor 21% Cross-trained, self-performed crews cover more scope per hour on site than single-trade vendors on call-out.
Reactive-to-preventive shift 18% PM completion rises, reactive share falls, and change orders stop arriving as surprises.
Asset life 15% Consistent PM on HVAC plant, electrical distribution, and building systems defers replacement capital.
Energy optimization 14% Schedules, setpoints, and controls on the systems the team runs, plus larger retrofits with Ainsworth Energy where they pay.
Excess cleared costs 10% Escort hours, access scheduling delays, and security exposure fall when the crew is cleared. Because cleared staff carry a wage differential rather than a premium rate, the escort hours you remove usually exceed the differential you pay.

The six KPIs every integrated operations and maintenance agreement should carry: preventive-maintenance completion rate; on-time work-order completion; mean time to respond and to repair; reactive share of maintenance hours; audit findings attributable to facility services; energy intensity for controlled systems. Ask any provider to report all six from one system. We do, and what’s more, we publish two of them: 99 percent on-time work-order completion and 98 percent client retention.

Consolidating vendors into integrated operations without a service gap

1

Baseline

First, the Scope Baseline classifies every recurring task across today’s vendors as value-added, preferential, required non-value-added, or waste. That way, we protect what works before anything moves.

2

Clear the people first

Clearance processing is the long pole, so we mobilize cleared staff ahead of the cutover, not after it.

3

Move one service line at a time

Each line transitions on its own date, with the outgoing vendor in place until completion records show that the new team meets the standard.

4

Report from day one

The six KPIs run from the first month, so your facility lead, quality team, and sourcing team all see the same numbers.

Questions about integrated operations and maintenance

What is integrated operations and maintenance (integrated O&M)?

Integrated operations and maintenance puts one self-performing team on a site’s hard services (HVAC plant, electrical distribution, plumbing, lighting, building systems) and its soft services (custodial, industrial housekeeping, grounds, waste). The same team keeps the compliance documentation, under one site manager, one operating system, and one agreement. By contrast, the alternative is six to twelve vendors with separate purchase orders, separate badge requests, and nobody who owns the gap between them.

When does integrated operations and maintenance make sense for a manufacturing plant?

When any of four conditions holds: the site has controlled or closed areas where every vendor visit costs an escort; the vendor count has grown past what the facility team can coordinate; reactive maintenance has climbed to the point where change orders are a budget line; or a new building is coming online and nobody has specified its service model yet. Sites below about 150,000 square feet with no secure space often do well enough with local vendors. Above that size, or with any cleared space, integration pays for itself in coordination hours and escort hours before you count any labor saving.

What KPIs should an integrated operations and maintenance contract carry?

Six, reported monthly from the same system that manages the work: preventive-maintenance completion rate; on-time work-order completion; mean time to respond and to repair for priority calls; reactive share of total maintenance hours; audit findings attributable to facility services (target zero); and energy intensity for the areas the provider controls. IH Services reports all six through R3 Secure FacilityOps and, in addition, publishes two of them as standing proof points: 99 percent on-time work-order completion and 98 percent client retention.

How do you move a defense site to integrated maintenance without a service gap?

Baseline first, then transition by service line rather than all at once. The Scope Baseline classifies every recurring task across the current vendors by the value it carries, so the transition plan protects what works. Because clearance processing is the long pole, we mobilize cleared staffing ahead of the cutover date. Each service line then moves on its own date, with the outgoing vendor still in place until the completion records show the new team is meeting the standard. A full-site consolidation typically runs in phases over a quarter, and we agree the exact plan site by site.

Does a cleared crew cost more than supplying escorts?

Usually not, as long as the cleared staff carry a wage differential rather than a premium rate. IH Services pays cleared employees a differential over the uncleared role and passes it through, so there is no separate cleared premium. Compare that differential on the crew your site needs with the escort hours your cleared staff absorb today at their loaded cost. We also clear two or three employees beyond the site’s need, so when a cleared employee’s performance slips we bring in a replacement from the bench instead of keeping the person on because a new clearance would take months.

How does integrated operations and maintenance reduce cost at a secure site?

Through six levers that IH Services tracks as planning assumptions, in order of weight: process waste that disappears when hand-offs between vendors disappear; labor productivity from cross-trained, self-performed crews; the shift from reactive to preventive maintenance; longer asset life from consistent PM; energy optimization on the systems the team controls; and the escort hours and access delays that cleared staff eliminate. The year-one structural target is 10 to 15 percent of in-scope facility cost, and we confirm it against each site’s own baseline before we commit to it.

Which site has the most vendors on it right now?

Start there. A ten-day Readiness Scan puts a number on the backlog, the reactive share, and the escort hours before we propose anything.

Request a Readiness Scan

Scroll to Top